The NAG3 Cryogenic Gas Handling Plant required a comprehensive electrical and instrumentation infrastructure capable of supporting the operation and control of a large-scale gas processing facility.
The project involved integrating multiple plant systems—including power distribution, process control, instrumentation, metering, safety systems, and protection infrastructure—into a coordinated facility-wide installation.
We adopted a turnkey approach covering the installation and hookup of the plant’s electrical and instrumentation systems. This included cable laying and termination, fabrication of cable and equipment supports, installation of control and power systems, and connection of field instrumentation.
The approach also incorporated the plant’s safety and protection infrastructure, including fire and gas systems, firefighting systems, earthing, and lightning protection, ensuring that these systems formed part of the overall plant installation rather than being treated as separate components.
We are executing the plant-wide electrical and instrumentation installation and hookup for the NAG3 Cryogenic Gas Handling Plant.
The scope includes installation of:
The works cover the infrastructure required to support the operation of the 200 MMSCF facility.
The ongoing project is establishing the integrated electrical, instrumentation, control, safety, and protection infrastructure required for the NAG3 facility.
By bringing these systems together under a turnkey installation and hookup scope, the project provides the plant with the essential infrastructure needed for power distribution, process control, monitoring, measurement, equipment operation, and facility protection as the project progresses toward completion.